UpComing Tradeshows

January 27-30, 2020
HELI-EXPO 2020
Anaheim, CA

April - 2013

19 April 2013

Press Pump

Altra Industrial Couplings manufactures bespoke grid coupling for 10,000 tonne press pump

The grid coupling of a large water pump at Sheffield Forgemasters Engineering Ltd. (S.F.E.L.) was coming to the end of its operational life. To avoid costly re-engineering of the pump S.F.E.L. wanted to commission a bespoke coupling to match the original’s footprint.

Read More